As pre production comes to a close, im finishing off the last bits of admin. The flow chart was really rushed but it basically outlines what needs to be done/what has already been done.

The Pipeline below is done by weeks. If i can actually stick to its timeline i will be in a good postion before i go to the USA. I need to get alot of work done before the end of semester as once i finish on the 03/06/11 and im basically not back untill the 23/08/11.

I want the following ready/complete before the end of the system:
--> backgrounds ready for colour
--> Animation tests complete
--> Avery puppet ready to animate
--> Sal puppet ready to animate